Sl No Report No Test Description Client  Date of issue     Download
139 CM 144/22-23 Compressive strength of Hardened Concrete:TCR-Repairs And Improvements To Goods Platform ,Roads And Drainage Office of the Senior Section Engineer/Works ,Southern Railway, Thrissur 03-02-2023 CM 144/22-23
138 CM 151/22-23 Compressive strength of Solid Concrete Blocks: Construction of Residential apartment for Navera Projects at Padukkad. M/s Olivia Projects, Punkunnam,Thrissur 02-02-2023 CM 151/22-23
137 CM 150/22-23 Compressive strength of Hardened Concrete:For the Construction of  Commercial Building for DilipKumar,Iringapuram at Guruvayoor. M/s Olivia Projects, Punkunnam,Thrissur 01-02-2023 CM 150/22-23
136 CM 149/22-23 Compressive strength of Hardened Concrete:For the Construction of PHYGICART HEAD OFFICE at Nellayi in Thrissur District. M/s Olivia Projects, Punkunnam,Thrissur 01-02-2023 CM 149/22-23
135 CM 148/22-23 Compressive strength of Hardened Concrete:For the Construction of PHYGICART HEAD OFFICE at Nellayi in Thrissur District. M/s Olivia Projects, Punkunnam,Thrissur 01-02-2023 CM 148/22-23
134 CM 153/22-23 Report on Sheet Piles: Rectification works of RCB at Chamravattom across Bharathapuzha Assistant Engineer, Chamravattom Project Section 1/1, Eswaramangalam 30.01.2023 CM 153/22-23
133 CM 135/22-23 Report of Stainless steel specimens: Research work on the web crippling failure mode observed in floor  joist structures Sreejith Suresh, PhD Student, Glasgow Caledonian University (UK) 24.01.2023 CM 135/22-23
132 CM 142/22-23 Report of the Test on WMM materials : JJM 2022-23 Pavaratty Regional Water Supply Scheme to Thrithala  Panchayath -Supplying, laying testing and commisioning of 160mm 110mm 90mm PE pipes at Mezhatur, Vattolikavu Road in Thrithala Panchayat Mr. K.M Naseer, Govt. Contractor ‘A’ Class, Mannuthy 24.01.2023 CM 142/22-23
131 CM 141/22-23 Report of the Test on GSB materials : JJM 2022-23 Pavaratty Regional Water Supply Scheme to Thrithala  Panchayath -Supplying, laying testing and commisioning of 160mm 110mm 90mm PE pipes at Mezhatur, Vattolikavu Road in Thrithala Panchayath. Mr. K.M Naseer, Govt. Contractor ‘A’ Class, Mannuthy 24.01.2023 CM 141/22-23
130 CM 125/22-23 Mix Design- Construction of New 3 Storey School Building, St. Mary’s UP School The Project Engineer, St. Mary’s UP School, Lourdes Church, Thrissur 21.01.2023 CM 125/22-23 Interim Report
129 CM 121/22-23 Compressive strength of Hardened Concrete:Re- Build Kerala Initiative-Construction of Smart Anganwadi no.70 in ward no.8 of Mathilakam GP. Office of Assistant
Engineer, LSGD (LID &EW) Section,
Mathilakam Grama Panchayath .
   
19-01-2023 CM 121/22-23
128 CM 120/22-23 STEEL TEST:Re Build Kerala Initiative-Construction of Smart Anganwadi no.70 in ward no.8 of Mathilakam GP Office of Assistant
Engineer, LSGD (LID &EW) Section,
Mathilakam Grama Panchayath .
19-01-2023 CM120/22-23
127 CM 143/22-23 Compressive strength of Hardened Concrete:For the New Building Construction (Top Floor) for Dialysis Unit Irinjalakuda in Thrissur District.. Regional In Charge(HCD-P&S)
M/s HLL Lifecare Ltd.
Thiruvananthapuram
19-01-2023 CM 143/22-23
126 CM 140/22-23 Compressive strength of Hardened Concrete:For the Construction of PHYGICART HEAD OFFICE at Nellayi in Thrissur District. M/s Olivia Projects, Punkunnam,Thrissur 19-01-2023 CM 140/22-23
125 CM 118/22-23 PILE INTEGRITY TEST :Varayannur Aqueduct : Constructing Aqueduct in place of Collapsed Varayannur Aqueduct of Poovathoor East Branch canal at Ch. 1000m(15  nos. Piles)” Assistant Engineer,PIP Section no.6 Eraviperoor 17-01-2023 CM 118/22-23
124 CM 132/22-23 Compressive strength of Concrete Paver Blocks:DF-MLA-2021-22 Nattika LAC -Paving of tiles on Kizhuppillikkara lift irrigation scheme pump house road in    ward 9 of Thanniam GP Office of Assistant Engineer, Minor Irrigation Section, Cherpu 16-01-2023 CM 132/22-23
123 CM 126/22-23 Compressive strength of Hardened Concrete :DSYA-Construction of 200m Synthetic Track &Change Room Building at Govt. Fisheries school,Nattika,Thrissur Project Engineer ,Sports Kerala Foundation ,Trivandrum 11-01-2023 CM 126/22-23
122 CM 134/22-23 Test on Gauge wire: Construction of Solar Fencing at Ennakkal forest station ,around Adichilthottil Adhivasi Colony”. Range Forest Officer, Idamalayar Range, Vadattupara 11-01-2023 CM 134/22-23
121 CM 133/22-23 Test on Gauge wire:Construction of Solar Fencing at Ennakkal forest station ,around Thera Adhivasi Colony”. Range Forest Officer, Idamalayar Range, Vadattupara 11-01-2023 CM 133/22-23
120 CM 128/22-23 Compressive strength of Hardened Concrete :For the New Building Construction (Top Floor) for Dialysis Unit Irinjalakuda in Thrissur District Regional In Charge(HCD-P&S)
M/s HLL Lifecare Ltd.
Thiruvananthapuram
11-01-2023 CM 128/22-23
119 CM 131/22-23 Compressive strength of Solid Concrete Blocks: Construction of Residential apartment for Navera Projects at Padukkad. M/s Olivia Projects, Punkunnam,Thrissur 7-01-2023 CM 131/22-23
118 CM 85/22-23 PILE INTEGRITY TEST :Varayannur Aqueduct of POOVATHOOR  EAST BRANCH CANAL Assistant Engineer,PIP Section no.6 Eraviperoor 6-01-2023 CM 85/22-23
117 CM 124/22-23 Tests on Fine & Coarse aggregates : 20 mm & 12 mm  M/s Prathmesh & KK (JV),81 Tilak Nagar,Aurangabad,Maharastra 6-01-2023 CM 124/22-23
116 CM 122/22-23 Test on of Tile Specimens :Construction of Permanent Campus for Indian Institute of  Technology Palakkad Phase I A (Package I) at Pudussery Village,  Kanjikode West, District Palakkad, Kerala M/s. Shapoorji and Company Private Ltd 5-01-2023 CM 122/22-23
115 CM 127/22-23 Compressive strength of Hardened Concrete :Construction of School Building at Govt. WLP School,Puliparakkunnu,Thrissur             Office of Assistant engineer,    PWD Building section , Irinjalakuda  ,Thrissur 5-01-2023 CM 127/22-23
114 CM 119/22-23 Compressive strength of Hardened Concrete : Expansion building for paramedical educational facilities in Govt. Medical College, Thrissur Assistant Engineer, PWD Special Buildings Section, MG Kavu, Thrissur 21-12-2022 CM 119/22-23
113 CM 116/22-23 Compressive strength of Solid Concrete Blocks: Construction of Damaged Compound Wall and Wire Fencingat KERI Quarters and Offices for the Year       2021-22. Assistant Engineer, Head Works Section, Peechi 19-12-2022 CM 116/22-23
112 CM 89/22-23 Compressive strength of Hardened Concrete : AMRUT 2017-18-Floating Intake Structure at Peechi Dam-Providing anchor and thrust blocks-KSEB Road Concreting  Assistant Engineer, Public Health  Section, Kerala Water Authority, Peechi 17-12-2022 CM 89/22-23
111 CM 87/22-23 Compressive strength of Hardened Concrete : AMRUT 2017-18-Floating Intake Structure at Peechi Dam-Providing anchor and thrust blocks-RCC Foot bridge Beam and Slab  Assistant Engineer, Public Health  Section, Kerala Water Authority, Peechi 17-12-2022 CM 87/22-23
110 CM 113/22-23 STEEL TEST:-“KIIFB Project Construction of Regulator Cum Bridge across Thoothapuzha at Keezhmurikadavu, Moothikkayam in Moorkkanad Panchayath, Malappuram District. Project Coordinator-14 , Kerala Irrigation Infrastructure  Development Corporation Ltd. Thiruvananthapuram 16.12.2022 CM 113/22-23
109 CM 112/22-23 Test on GI Pipe, wire, Tension spring :Construction of Solar Fencing at Vadattupara Forest Station The Range Forest Officer,  Thundathil Range,Boothathankettu,kothamangalam 16.12.2022 CM 112/22-23
108 CM 105/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Elikkodu Colony. The Range Forest Officer,                Palapilly Forest Range 05.12.2022 CM 105/22-23
107 CM 93/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at The Range Forest Officer, Vellikulangara Forest range, Inchakundu. The Range Forest Officer,     Vellikulangara Forest range 05.12.2022 CM 93/22-23
106 CM 110/22-23 Compressive Strength Test of Hardened Concrete-M25-SRR-CHTS sec-Proposed strengthening of formation  by providing stone pitching at KM 50/550-50/850 DN Line Office of the Senior Section Engineer/Works ,Southern Railway, Thrissur 3-12-20222 CM 110/22-23
105 CM 109/22-23 Compressive Strength Test of Hardened Concrete–M20-QCTR  Improvement works to thrygram LIS in Poyya Panchayath Reconstruction of pump house and elevated water tank,   MI Section Mala  Office of the Assistant Engineer, Irrigation Quality Control Section, Thrissur 3-12-20222 CM 109/22-23
104 CM 108/22-23 Compressive Strength Test of Hardened Concrete-M15 QCTD 25/10/2022  Improvement Devichirakulam in Varavoor Panchayath.,    MI Section,Wadakkanchery  Office of the Assistant Engineer, Irrigation Quality Control Section, Thrissur 3-12-20222 CM 108/22-23
103 CM 107/22-23 Compressive Strength Test of Hardened Concrete M10-QCTV Concrete Cylinder -PSM-2020-21-Improvement works to LBMC14/8000 and 15/800 km. Peechi project section, Mannamangalam Office of the Assistant Engineer, Irrigation Quality control Section,Thrissur 3-12-20222 CM 107/22-23
102 CM 104/22-23 Compressive strength of Concrete Cube samples: -M25 grade-SRR-CHTS sec-Proposed strengthening of formation  by providing stone pitching at KM 50/550-50/850 DN LINE Office of the Senior Section Engineer/Works ,Southern Railway, Thrissur 3-12-20222 CM 104/22-23
101 CM 103/22-23 Compressive strength of Concrete Cube samples: -M25 grade-SRR-CHTS sec-Proposed strengthening of formation  by providing stone pitching at KM 50/550-50/850 DN LINE Office of the Senior Section Engineer/Works ,Southern Railway, Thrissur 3-12-20222 CM 103/22-23
100 CM 100/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Palappilly Forest Range-Cheenikkunnu Colony                 The Range Forest Officer,                Palapilly Forest Range 28-11-2022 CM 100-22-23
99 CM 99/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Kalady Forest range-Pandupara               The Range Forest Officer,                   Kalady Forest range 28-11-2022 CM 99-22-23
98 CM 98/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Vellikulangara Forest Range-Nayattukundu area The Range Forest Officer,     Vellikulangara Forest range 28-11-2022 CM 98-22-23
97 CM 97/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Palapilly Forest Range-Parakadavu Colony            The Range Forest Officer,               Palapilly Forest Range 28-11-2022 CM 97-22-23
96 CM 96/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Vellikulangara Forest Range-Kannatupadam The Range Forest Officer,     Vellikulangara Forest range 28-11-2022 CM 96-22-23
95 CM 95/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Vellikulangara Forest range-Pothenchira The Range Forest Officer,     Vellikulangara Forest range 28-11-2022 CM 95-22-23
94 CM 94/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Kodanadu Forest Range, Mekkapala Forest Station. The Range Forest Officer,            Kodanadu Forest Range 28-11-2022 CM 94-22-23
93 CM 101/22-23 Test on GI Pipe, wire, Tension spring :Construction of Solar Fencing at Athirapilly Station,.Athirapilly Forest range”. The Range Forest Officer, Athirapilly Forest range, 25-11-2022 CM 101/22-23
92 CM 70/22-23 Mix Design- M25:Deposit work of Malapuram Municipality 2020-21 Construction of a regulator near Nambrani Kadavu across Kadalundi River in Malappuram Municipality in Malappuram District Assistant Engineer, Irrigation Section, Malapuram. 24.11.2022 CM 70/22-23
91 CM 69/22-23 Mix Design- M30:Deposit work of Malappuram Municipality 2020-21 Construction of a regulator near Nambrani Kadavu across Kadalundi River in Malappuram Municipality in Malappuram District Assistant Engineer, Irrigation Section, Malapuram. 24.11.2022 CM 69/22-23
90 CM 58/22-23 STEEL TEST:-“Deposit work of Malappuram Municipality 2020-21 Construction of a Regulator near Nambrani Kadavu across Kadalundi river in Malappuram Municipality in Malappuram District Assistant Engineer, Irrigation Section, Malapuram. 24.11.2022 CM 58/22-23
89 CM 102/22-23 Resistance to wear-Tiles Malabar Gold Pvt Ltd, MHQ Interiors, Malabar Group headquarters, Montanna Estates, Perigolam P.O, Calicut-673571 24.11.2022 CM 102/22-23
88 CM 54/22-23 Mix Design- M20:TCR- Sub-Division- Elimination of shortfall in minimum Essential Amenities at Stations. Southern Railway, Thrissur 17-11-22 CM 54/22-23
87 CM 53/22-23 Mix Design- M25: TVC Division-    Construction of  Gang rest room at TCR, CKI,AWY P-Way    sections Southern Railway, Thrissur 17-11-22 CM 53/22-23
86 CM 92/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Konnakuzhi Forest Station
Station, Pariyaram Forest Range
Range Forest Officer, Pariyaram Range, Konnakuzhi Forest Station 4-11-2022 CM 92/22-23
85 CM 91/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Chaiappankuzhi Forest Station
Station, Pariyaram Forest Range
Range Forest Officer, Pariyaram Range, Chaiappankuzhi Forest Station 4-11-2022 CM 91/22-23
84 CM 88/22-23 STEEL TEST:Construction Of New Building for Injamudi Family Health Sub Centre under Alappad FHC at ward 10 of Chazhur Gramapanchayath-phase I General Civil work” Assistant Engineer, PWD Buildings Section, Ayyanthole 1-11-2022 CM 88/22-23
83 CM 86/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Ennakkal  Forest Station, Idamalaiyar range Range Forest Officer, Idamalayar Range, Vadattupara 28-10-2022 CM 86/22-23
82 CM 84/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Nedumkayam l  Forest Station, Karulayi range Range Forest Officer, Karulayi Range, Karimpuzha Wildlife Sanctuary 28-10-2022 CM 84/22-23
81 CM 83/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Ennakkal  Forest Station, Idamalaiyar range Range Forest Officer, Idamalayar Range, Vadattupara 28-10-2022 CM 83/22-23
80 CM 79/22-23 STEEL TEST: TCR -Sub division –Construction of Boundary wall to safegaurd track and establishments Southern Railway, Thrissur 28-10-2022 CM 79/22-23
79 CM 68/22-23 Tests on Fine & Coarse aggregates : 20 mm & 12 mm  M/S Builtech Gateway Ventures LLP,Chittur ,Palakkad 28-10-2022 CM 68/22-23
78 CM 63/22-23 Mix Design- M20: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist.
Irrigation Section No.2, Ponnani 28-10-2022 CM 63/22-23 FINAL
77 CM 62/22-23 Mix Design- M25: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 28-10-2022 CM 62/22-23 FINAL
76 CM 61/22-23 Mix Design- M30: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist Irrigation Section No.2, Ponnani 28-10-2022 CM 61/22-23 FINAL
75 CM 53/22-23 Mix Design- M25: TVC Division- Construction of Gang rest room at TCR, CKI,AWY P-Way sections Southern Railway, Thrissur 28-10-2022 CM 53/22-23
74 CM 80/22-23 Compressive strength of Concrete Core samples: IIP LLC-Providing Flush escape at Ch. 12540m-Balance work-6th barrel IIP Section 1/2, Angamaly 20.10.2022 CM 80/22-23
73 CM 81/22-23 Compressive strength of Concrete Core samples: IIP LLC-Providing Flush escape at Ch. 12540m-Balance work-5th barrel IIP Section 1/2, Angamaly 20.10.2022 CM 81/22-23
72 CM 82/22-23 Compressive strength of Concrete Cube samples: First floor Slab Concreting-M25 grade T.K.K. Trade Centre, Talikulam, Thrissur 20.10.2022 CM 82/22-23
71 CM 78/22-23 STEEL TEST: Koottala LIS-Construction of pump house, cistern and laying delivery and distribution pipe for an additional ayacut at Koottala LIS water tank Minor Irrigation Section, Thrissur 18.10.2022 CM 78/22-23
70 CM 54/22-23 Mix Design- M20: TCR- Sub-Division- Eliminatioon of shortfall in minimum Essential Amenities at Stations Southern Railway, Thrissur 18.10.2022 CM 54/22-23 Interim
69 CM 53/22-23 Mix Design- M25: TVC Division- Construction of Gang rest room at TCR, CKI,AWY P-Way sections Southern Railway, Thrissur 18.10.2022 CM 53/22-23 Interim
68 CM77/22-23 Compressive strength of Concrete Cube samples: Deposit- Plan scheme 2020-21 Renovation of Revenue Offices-Roof slab concrete of extension of record room in Mukundapuram Taluk Office Assistant Engineer, PWD Buildings Section, Irinjalakuda 13.10.2022 CM 77_22-23
67 CM71/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Kanimangalam Forest Station, Kalady range Range Forest Officer,Kalady Range, Neeleeswaram 11.10.2022 cm 71/22-23
66 CM 75/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Ennakkal Forest Station, Idamalayar range Range Forest Officer, Idamalayar Range, Vadattupara 11.10.2022 CM 75/22-23
65 CM 35/22-23 Tests on Cement : Construction of Kanathodu Regulator cum Bridge at Kundukadavu in Pudukkad Panchayath Project Engineer-37, Kerala Irrigation Infrastructure Development Corporation Ltd, Thrissur 11.10.2022 CM 35 /22-23
64 CM 34/22-23 Tests on Fine & Coarse aggregates : Construction of Kanathodu Regulator cum Bridge at Kundukadavu in Pudukkad Panchayath Project Engineer-37, Kerala Irrigation Infrastructure Development Corporation Ltd, Thrissur 11.10.2022 CM 34/22-23
63 CM 74/22-23 Compressive strength of Concrete Paver Blocks: General Plan Scheme 2021-22 Infra structure Development of Village Offices- Construction of Compound Wall to Village Offices- Mattathur Village Assistant Engineer, PWD Buildings Section, Chalakudy 03.10.2022 CM 74/22-23
62 CM 72/22-23 Compressive strength of Concrete Paver Blocks: General- Construction of  Compound of Chengaloor Village Office Assistant Engineer, PWD Buildings Section, Irinjalakuda 03.10.2022 CM 72/22-23
61 CM 73/22-23 NDT- UPV Test: Rennovation of Erayamkudy Thura in Annammanada GP –Concrete Retaining Wall M15 Grade – Second Lift – Top Portion”. MI Section, Chalakkudy 26.09.2022 CM 73/22-23
60 CM 65/22-23 Compressive strength of Concrete Cube samples:  General Education Department- Annual Plan 2020-2021-Construction of School Building of Government L P school, Thrikkur, Thrissur PWD Buildings Section,

Irinjalakuda

26.09.2022 CM 65/22-23
59 CM 64/22-23 Compressive strength of Concrete Cube samples: PWD Buildings Section,

Irinjalakuda

26.09.2022 CM 64/22-23
58 CM 57/22-23 Test on GI Pipe, wire, Tension spring : Construction of Solar Fencing at Evergreen Forest Station, Kalady range Kalady Range, Neeleeswaram 26.09.2022 CM 57/22-23
57 CM 67/22-23 Compressive strength of Concrete Cube samples:Deposit – Plan scheme 2020-21 Renovation of Revenue Offices PWD Buildings Section, Irinjalakuda 17.09.2022 CM 67/22-23
   56 CM 63/22-23 Mix Design- M20: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist Irrigation Section No.2, Ponnani 15.09.2022 CM 63/22-23
55 CM 62/22-23 Mix Design- M25: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist Irrigation Section No.2, Ponnani 15.09.2022 CM 62/22-23 Interim
54 CM 61/22-23 Mix Design- M30: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist Irrigation Section No.2, Ponnani 15.09.2022 CM 61/22-23 INTERIM
53 CM 66/22-23 Compressive strength of Concrete Cube samples: Shopping Centre (TKK Trade Centre) Slab Concreting (M25 grade) Sri. Aneesh T.S, T.K.K Trade Centre, Talikulam, Thrissur 15.09.2022 CM 66/22-23
52 CM 56/22-23 Compressive strength of Concrete Cube samples: Plinth Beam (M25 grade) Sri. Aneesh T.S, T.K.K Trade Centre, Talikulam, Thrissur 15.09.2022 CM 56/22-23
51 CM 46/22-23 Strength of Rock samples: Haritha Kerala Mission- Investigation for the Construction of Bandhara Scheme across Kunthipuzha at Pombra Kanhirayikadavu in Karimpuzha Gramapanchayath in Palakkad District Instrumentation Division,

K. E. R. I, Peechi

06.09.2022 CM 46/22-23
50 CM 44/22-23 Strength of Rock samples: Haritha Kerala Mission- Investigation for the Construction of Bandhara Scheme across Kunthipuzha at Pombra Kanhirayikadavu in Karimpuzha Gramapanchayath in Palakkad District Instrumentation Division,

K. E. R. I, Peechi

06.09.2022 CM 44/22-23
49 CM 42/22-23 Strength of Rock samples: Haritha Kerala Mission- Investigation for the Construction of Bandhara Scheme across Kunthipuzha at Pombra Kanhirayikadavu in Karimpuzha Gramapanchayath in Palakkad District Instrumentation Division,

K. E. R. I, Peechi

06.09.2022 CM 42/22-23
48 CM 60/22-23 STEEL TEST: General-GEDN-Construction of Lab and Library for Govt. Higher Secondary School Mupliyam PWD Buildings Section, Irinjalakuda 03-09-2022 CM 60/22-23
47 CM 59/22-23 Compressive strength of Concrete Solid Blocks : General-GEDN-Construction of Lab and Library for Govt. Higher Secondary School Mupliyam PWD Buildings Section, Irinjalakuda 03-09-2022 CM 59/22-23
46 CM 47/22-23 Mix Design: M25- TVC-Sub division- Construction of boundary wall to safe Guard track and establishment Senior Section Engineer, Southern Railway, Thrissur 31.08.2022 CM 47_22-23 Final report
45 CM 55/22-23 Compressive strength of Concrete Cube samples: Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities –Sri Achutha Menon Govt. College–Hostel Block-Sump Top slab Team Leader, WAPCOS Ltd., Central Zone 23.08.2022 CM 55/22-23
44 CM 49/22-23 Heat Resistant Tiles: Construction of Permanent Campus for Indian Institute of Technology Palakkad Phase I A (Package I) at Pudussery Village, Kanjikode West, District Palakkad, Kerala Palakkad Project Zone, CPWD, Palakkad 20-08-2022 CM 49/22-23
43 CM 50/22-23 Compressive strength of Concrete Cube samples: Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities –Sri Achutha Menon Govt. College–Hostel Block-Sump Top slab Team Leader, WAPCOS Ltd., Central Zone 17.08.2022 CM 50/22-23
42 CM 45/22-23 Compressive strength of Concrete Cube samples: Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities –Sri Achutha Menon Govt. College–Sump Wall 1st lift Team Leader, WAPCOS Ltd., Central Zone 17.08.2022 CM 45/22-23
41 CM 27/22-23 Compressive strength of Concrete Cube samples: Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities –Sri Achutha Menon Govt. College–Sump Wall 1st lift
Team Leader, WAPCOS Ltd., Central Zone 17.08.2022 CM 27/22-23
40 CM 47/22-23 Mix Design: M25- TVC-Sub division- Construction of boundary wall to safe Guard track and establishment Senior Section Engineer, Southern Railway, Thrissur 12.08.2022 CM 47/22-23
39 CM 52/22-23 Thickness of GI Pipe, Wire &  Strength of Solar Fence tension spring   Forest Range Officer, Thundathil Range, Bhoothathankettu, Kothamangalam 11.08.2022 CM 52/22-23
38 CM 51/22-23 Compressive strength of Concrete Cube samples: Olivia Projects- Site: Rajan Ollukkara/Mannuthy (M35 grade) RDC Concrete India Pvt Ltd, Plot No. 191/1P & 191/8P, Industrial development Area, Mundoor, Thrissur 11.08.2022 CM 51/22-23
37 CM 41/22-23 Cement Test: PENNA OPC 53 Grade- Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities in Government Arts and Science Colleges and Government Engineering Colleges for Cluster C3 in Thrissur and Ernakulam Team Leader, WAPCOS Ltd., Central Zone 23.07.2022 CM 41/22-23
36 CM 40/22-23 Cement Test: PENNA PPC – Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities in Government Arts and Science Colleges and Government Engineering Colleges for Cluster C3 in Thrissur and Ernakulam Team Leader, WAPCOS Ltd., Central Zone 23.07.2022 CM 40/22-23
35 CM 31/22-23 Mix Design: M30 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 23.07.2022 CM 31/22-23
34 CM 30/22-23 Mix Design: M25 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 23.07.2022 CM 30/22-23
33 CM 29/22-23 Mix Design: M20 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 23.07.2022 CM 29/22-23
32 CM 28/22-23 Compressive strength of Concrete Cube samples: Construction of Brackish Water Finfish Seed Production Unit at Regional Shrimp Hatchery Azhikode Nirmithi Kendra Thrissur,

Reg. No. 20/92

14.07.2022 CM 28/22-23
31 CM 25/22-23 Mix Design : M30,M35 & M40 grades “Kalyan Silks Show room Building at Palakkad” M/s KMP Consultants, Civil Engineers & Professional Contractors, Press Club Road, Thrissur 14.07.2022 CM 25/22-23
30 CM 39/22-23 Compressive strength of Concrete Cube samples: Cluster 03-KITE-INFRA-Creation of basic Infrastructure facilities –Sri Achutha Menon Govt. College–Sump Base Slab Team Leader, WAPCOS Ltd.,

Central Zone

05.07.2022 CM 39/22-23
29 CM 38/22-23 Compressive strength of Concrete Cube samples: AMRUT 2017-18- Floating Intake Structure- Providing anchor and thrust blocks Public Health Section, Kerala Water Authority, Peechi 05.07.2022 CM 38/22-23
28 CM 37/22-23 Compressive strength of Concrete Cube samples: AMRUT 2017-18- Floating Intake Structure- Providing anchor and thrust blocks Public Health Section, Kerala Water Authority, Peechi 05.07.2022 CM 37/22-23
27 CM 36/22-23 Compressive strength of Concrete Cube samples: AMRUT 2017-18- Floating Intake Structure- Providing anchor and thrust blocks Public Health Section, Kerala Water Authority, Peechi 05.07.2022 CM 36/22-23
26 CM 22/22-23 PILE INTEGRITY TEST :VFPCK – Construction of Farmer’s Training College at Anayara Kerala Land Development Corporation Ltd, Kayamkulam 04.07.2022 CM 22/22-23 PET Report
25 CM 21/22-23 Compressive strength of Concrete Cube samples:  AMRUT 2017-18- Floating Intake Structure at Peechi Dam-(Balance Work Appendix-1:Construction of RCC foot bridge for pipe line worm across canal-2 Nos Public Health Section, Kerala Water Authority, Peechi 28.06.2022 CM 21/22-23
24 CM 29/22-23 Mix Design: M20 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 25.06.2022 CM 29/22-23 Interim
23 CM 30/22-23 Mix Design: M25 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 25.06.2022 CM 30/22-23 Interim
22 CM 24/22-23 Compressive strength of Concrete Cube samples: Cluster 03: Panambilly Memmorial Govt. College- Canteen Block Team Leader, WAPCOS Ltd., Central Zone   25-06-2022 CM 24/22-23
21 CM 32/22-23 STEEL TEST: CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 24-06-2022 CM 32/22-23
20 CM 31/22-23 Mix Design: M30 –CSIND – Construction of Lock cum bridge in CH:316.728 Km of West Coast Canal at Veliyancode in Ponnani Taluk, Malappuram Dist. Irrigation Section No.2, Ponnani 24-06-2022 CM 31/22-23 Interim
19    CM 16/22-23 NON DESTRUCTIVE TESTS : KIP (RBMC) – KODUMON AQUEDUCT DISTRIBUTORY CH. 7650M TO 7850M Chief Engineer (Projects II), Special Enquiry Cell,  Thiruvananthapuram       21-06-2022 CM 16/22-23
18 CM 20/22-23 Structural Steel Hollow Section: Construction of Aayakar Bhawan Building, Kochi DGM (Engg), NBCC (India) Ltd 13.06.2022 CM 20/22-23
17 CM 19/22-23 Granite : Construction of Aayakar Bhawan Building, Kochi DGM (Engg), NBCC (India) Ltd 13.06.2022 CM 19/22-23
16 CM 18/22-23 Fine Aggregates: Construction of Aayakar Bhawan Building, Kochi DGM (Engg), NBCC (India) Ltd 13.06.2022 CM 18/22-23
15 CM 17/22-23 Cement Test: Construction of Aayakar Bhawan Building, Kochi  DGM (Engg), NBCC (India) Ltd 13.06.2022 CM 17/22-23
14 CM 11/22-23 Compressive strength of Concrete Cube samples: Cluster 03: Panambilly Memmorial Govt. College- Canteen Block  Team Leader, WAPCOS Ltd., Central Zone 09.06.2022 CM 11/22-23
13 CM 15/22-23 Compressive strength of Concrete Cube samples: Counter fort retaining wall for silver jubilee block at KFRI Peechi Site Engineer, PMR Constructions 02.06.2022 CM 15/22-23
12 CM 10/22-23 Mix Design: Construction of check dam cum bridge in Mullaringadu near Mullaringadu temple junction-M25 M.I. Section, Moolamattom 30.05.2022 CM 10/22-23
11 CM 10/22-23 Mix Design: Construction of check dam cum bridge in Mullaringadu near Mullaringadu temple junction-M25 M.I. Section, Moolamattom 09.05.2022 CM 10/22-23 Interim
10 CM 05/22-23 Sieve Analysis of GSB & WMM : Construction of Banana and Honey Park at Kannara farm Thrissur Planning Head, Thrissur District Labour Contract Co-Operative Society Ltd 27.04.2022 CM 05/22-23
9 CM 04/22-23 Sieve Analysis of P Sand : Construction of Banana and Honey Park at Kannara farm Thrissur Planning Head, Thrissur District Labour Contract Co-Operative Society Ltd 27.04.2022 CM 04/22-23
8 CM 12/22-23 Compressive strength of Concrete Cube samples: Establishment & Modernization of Drug store under DME- Construction of room for storage of lab reagents and reusables in GMCH Thrissur- Column footing Assistant Engineer, P.W.D Special Building Section,  Mulamkunnathukavu 22.04.2022 CM 12/22-23
7 CM 09/22-23 Compressive strength of Concrete Cube samples: Peechi Schenme- aqueduct- A Permanent Solution at Breached portion of Left Bund Main Canal bund Between Ch. 19/600 and 20/650 km (RKI) Assistant Engineer, Peechi Project Section,  Mannamangalam 21.04.2022 CM 09/22-23
6 CM 08/22-23 Compressive strength of Concrete Cube samples: Peechi Schenme- aqueduct- A Permanent Solution at Breached portion of Left Bund Main Canal bund Between Ch. 19/600 and 20/650 km (RKI). Assistant Engineer, Peechi Project Section,  Mannamangalam 21.04.2022 CM 08/22-23
5 CM 07/22-23 Compressive strength of Concrete Cube samples: Peechi Schenme- aqueduct- A Permanent Solution at Breached portion of Left Bund Main Canal bund Between Ch. 19/600 and 20/650 km (RKI). Assistant Engineer, Peechi Project Section,  Mannamangalam 21.04.2022 CM 07/22-23
4 CM 06/22-23 Compressive strength & water absorprtion of Concrete Paver Blocks: Construction of Banana and Honey Park at Kannara farm Thrissur Planning Head, Thrissur District Labour Contract Co-Operative Society Ltd 21.04.2022 CM 06/22-23
3 CM 01/22-23 Compressive strength of Concrete Cube samples: Peechi Scheme- aqueduct- A Permanent Solution at Breached portion of Left Bund Main Canal bund between Ch. 19/600 and 20/650 Km Assistant Engineer, Peechi Project Section,  Mannamangalam 21.04.2022 CM 01/22-23
2 CM 02/22-23 STEEL TEST : KIIFB Project Construction of Regulator Cum Bridge across Thoothapuzha at Keezhmurikadavu, Moothikkayam in Moorkkanad panchayath, Malappuram District Project Engineer-9, Kerala Irrigation Infrastructure Development Corporation Ltd, Thiruvananthapuram 19.04.2022 cm 02/22-23
1   CM 03/22-23 PILE INTEGRITY TEST : KIIFB Project  Construction of Regulator Cum Bridge across Thoothapuzha at Keezhmurikkadavu, Moothikkayam in Moorkkanad Panchayath Project Engineer-9, Kerala Irrigation Infrastructure Development Corporation Ltd, Thiruvananthapuram 13.04.2022 CM 03/22-23